Problems
How Long Does a Pool Cage Rescreen Take?
As a general expectation, not a quote: a single panel is under an hour. A mid-size pool cage, 20 to 40 panels, is commonly a full day. A larger or two-story cage, or a job that turns into a full restoration with frame work, can run multiple days. The variables, roughly in order of how much they move the number:
- Fastener condition. On a cage built with the house in the 1970s or 1980s — a meaningful share of Casselberry's housing stock — some percentage of the original screws will strip or shear rather than back out clean. Every one of those adds drilling and re-tapping time that a size-based estimate does not account for.
- Roof access. Roof panels take longer per panel than wall panels because of the access equipment and the tension work being done overhead.
- Panel count and reach. The straightforward variable — more panels, more time, roughly linearly once mobilization is accounted for.
- Weather. Florida's afternoon storm pattern can push a job an extra day without anything having gone wrong on site.
See your neighborhood's build era for a sense of what fastener condition to expect before the crew arrives.
<1 hrSingle ground-level panel
~1 dayMid-size cage, 20–40 panels
Multi-dayLarge/two-story cage or a job
that becomes a full restoration
Next step
Not sure which of these is your problem?
Describe what you're seeing — a couple of photos helps — and I can usually tell you over the phone.
